Remove Petroleum Remove Pipeline Remove ROV
article thumbnail

Mastering NSTA Infrastructure Reporting: ArcGIS Pro Best Practice

Exprodat

As part of this, the Energy Act 2016 requires each UKCS operator to appoint a named Information and Samples Coordinator (ISC), who is responsible for reporting petroleum-related information to NSTA. Section 34 of this act requires pipeline and infrastructure data to be reported. Pipeline points – spools, valves, etc.

article thumbnail

Mastering NSTA Infrastructure Reporting: ArcGIS Pro Best Practice

Exprodat

As part of this, the Energy Act 2016 requires each UKCS operator to appoint a named Information and Samples Coordinator (ISC), who is responsible for reporting petroleum-related information to NSTA. Section 34 of this act requires pipeline and infrastructure data to be reported. Pipeline points – spools, valves, etc.