Remove Management Remove Offshore Remove Pipeline
article thumbnail

Federal Offshore Pipeline Decommissioning in BOEM Significant Sediment Resource Areas

The Energy Law

In recent years, there has been an increase in the number of denials of applications to decommission offshore pipelines in place in a departure from the Bureau of Safety and Environmental Enforcement’s (“BSEE”) longstanding practices. 250.1754. that, if left in place, would hinder other users of the OCS.” 250.1700(b).

article thumbnail

BOEM Overview of Proposed Gulf of Mexico Offshore Wind Areas and Draft Environmental Assessment

The Energy Law

The Bureau of Ocean Energy Management (BOEM) held its third Gulf of Mexico (GOM) Intergovernmental Renewable Energy Task Force meeting on July 27, 2022 (3 rd Meeting). The first two meetings were held on June 15, 2021 , and February 2, 2022 , respectively.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

AquaDuctus

Energy Central

GASCADE managing director Christoph von dem Bussche said the offshore pipeline, which will be more than 400 km long when completed, “will become a linchpin in Germany’s and Europe’s future offshore hydrogen infrastructure.”

article thumbnail

$5.8 Billion Question: BP Backs Away from Green Energy—but Is Offshore Wind Still Worth It?

Rextag

What does BPs latest move in offshore wind mean for its renewable energy strategy? BP and Japanese power company JERA have announced a joint venture (JV) to create one of the worlds largest offshore wind operators. BPs Offshore Wind Pipeline: 9.7 GW in projects, and 4.5 GW in secured leases. Funding: BP will invest $3.25

article thumbnail

2023 Begins With Increased (or Unlimited) Liability for Vessel Owners

The Energy Law

11] The Coast Guard is not responsible for adjusting OPA limits for offshore facilities (other than deepwater ports). 11] The Coast Guard is not responsible for adjusting OPA limits for offshore facilities (other than deepwater ports). Those limits were last increased in 2018 to $137,659,500 by the Bureau of Ocean Energy Management. [12]

Oil 98
article thumbnail

Mastering NSTA Infrastructure Reporting: ArcGIS Pro Best Practice

Exprodat

Section 34 of this act requires pipeline and infrastructure data to be reported. Essentially, this is the kit which sits on the seabed, undersea and at surface – be it pipelines, cables, SSIVs, platforms. Pipeline points – spools, valves, etc. How to manage updates on ongoing basis?

article thumbnail

Mastering NSTA Infrastructure Reporting: ArcGIS Pro Best Practice

Exprodat

Section 34 of this act requires pipeline and infrastructure data to be reported. Essentially, this is the kit which sits on the seabed, undersea and at surface – be it pipelines, cables, SSIVs, platforms. Pipeline points – spools, valves, etc. How to manage updates on ongoing basis?