Remove Government Remove Underground Injection Control Remove Utilities
article thumbnail

Livingston Parish Council Proposes Ordinance Banning Injection and Disposal Wells

The Energy Law

Last week, the Livingston Parish Council introduced a proposed ordinance that would place a moratorium on “the construction of disposal wells and injection wells in the Parish of Livingston.” [1] Tammany Parish Government v. Ordinance No. 2] The EPA regulations relating to Class VI wells can be found at 40 CFR §146.81 3/9/16); 199 So.3d

article thumbnail

A Primer on CCUS Regulation in Louisiana

The Energy Law

Carbon capture, utilization, and storage (CCUS) projects involve various legal issues. In addition to the unit order, the operator must receive approval for its injection wells. The State regulations that will govern Class VI wells once primacy is achieved are in Statewide Order No. This article focuses on the latter.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Advancement of CCS in Louisiana

The Energy Law

The next step for GCS will be to obtain a Class VI Underground Injection Control (“UIC”) permit from the U.S. Second, Louisiana already has a developed pipeline infrastructure that is necessary to transport carbon dioxide to where it can be utilized and stored.

article thumbnail

Advancement of CCS in Louisiana

The Energy Law

The next step for GCS will be to obtain a Class VI Underground Injection Control (“UIC”) permit from the U.S. Second, Louisiana already has a developed pipeline infrastructure that is necessary to transport carbon dioxide to where it can be utilized and stored. into deep rock formations beneath the Earth’s surface.