Remove Drilling rig Remove Maintenance Remove Presentation
article thumbnail

Louisiana Second Circuit Addresses: (1) Creation of Mineral Servitudes Via Notarial Acts of Correction; (2) Obstacles Suspending the Prescription of Nonuse from Running Against Mineral Servitudes; and (3) Payment of Court Costs in Concursus Actions

The Energy Law

25] In addition, the operator was unable to move a drilling rig onto the wellsite due to weather in February 2004, and as a result, the operator had to pay standby time for the rig. [26] 21] Prior to spudding the well, the operator faced weather delays and was required to obtain a CUA permit. [22] 1] See 51, 212 (La. 3/1/17).

Spud-in 40