Type of mud losses while oil and gas well drilling
Rig Skills
MAY 26, 2020
Add water at required rate by a small hose inside ditch line to compensate for liquid phase of drilling fluid converting into vapour due to temperature. 2-Hole fill Hole fill is mud required to fill the drilled hole as well drilling progress. These losses must be cure before continue further drilling.
Let's personalize your content