Remove Document Remove E&A Remove Underground Injection Control
article thumbnail

New Legislation Signals Strong Support for CCUS in Texas

The Energy Law

Environmental Protection Agency (“EPA”) that are subject to the requirements of Section 1421 of the Safe Drinking Water Act for the purpose of protecting underground sources of drinking water from endangerment. A Class VI Underground Injection Control permit is required prior to drilling and operating a Class VI well for CCUS operations.

article thumbnail

Texas Now One Step Closer to Obtaining Primacy Over Class VI Wells

The Energy Law

On August 30, 2022, the Texas Railroad Commission approved proposed regulations relating to Class VI wells utilized for injecting and sequestering carbon dioxide in geologic formations. Click here to read the RRC document and here for more detailed information on the regulation of Class VI wells.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

New Legislation Signals Strong Support for CCUS in Texas

The Energy Law

Environmental Protection Agency (“EPA”) that are subject to the requirements of Section 1421 of the Safe Drinking Water Act for the purpose of protecting underground sources of drinking water from endangerment. A Class VI Underground Injection Control permit is required prior to drilling and operating a Class VI well for CCUS operations.

article thumbnail

New Legislation Signals Strong Support for CCUS in Texas

The Energy Law

Environmental Protection Agency (“EPA”) that are subject to the requirements of Section 1421 of the Safe Drinking Water Act for the purpose of protecting underground sources of drinking water from endangerment. A Class VI Underground Injection Control permit is required prior to drilling and operating a Class VI well for CCUS operations.