Permian Basin Gas Production Pushes Limits – Infrastructure Expansion Needed
Rextag
OCTOBER 29, 2024
This surge in output has frequently led to capacity constraints, with operators facing choices like flaring gas, paying to dispose of it during negative pricing events, or cutting crude production. Beginning operations in early October, the pipeline can transport up to 2.5 Bcf/d of natural gas from the Permian to Katy, Texas.
Let's personalize your content