Remove Crude Oil Remove Maintenance Remove Upstream
article thumbnail

How Free Water Knockouts Work

OilPro

In the oil and gas industry, the process of separating water and other impurities from crude oil and natural gas is crucial for efficient and safe production. Three-phase FWKO’s are used to separate oil, gas, and water but require 3-phase piping with separate gas measurement and back pressure instruments and controls.

article thumbnail

EIA Lastest News – Product Prices & Pipeline News

The Energy Law

Crude oil was up over $2 per barrel. Furthermore, on September 5, FGT announced maintenance work beginning on September 6, which is expected to last until September 8. The unscheduled maintenance is on the larger of the two units located in Mississippi at Tennessee Carnes Interconnect, upstream of FGT Compressor Station.

article thumbnail

Profit Warnings and Production Cuts: Shell Faces Tough Energy Headwinds

Rextag

ADJUSTED PRODUCTION AND VOLUME FORECASTS Shell also reduced its integrated gas production outlook for the fourth quarter to 880,000 and 920,000 oil-equivalent daily barrels, citing scheduled maintenance at a Qatar-based facility. For upstream productioncovering crude oil and natural gas extractionShell expects output of 1.79

Energy 40