Remove Completion Remove Information Remove ROV
article thumbnail

Mastering NSTA Infrastructure Reporting: ArcGIS Pro Best Practice

Exprodat

As part of this, the Energy Act 2016 requires each UKCS operator to appoint a named Information and Samples Coordinator (ISC), who is responsible for reporting petroleum-related information to NSTA. That contains an Infrastructure feature dataset with feature classes suitable for storing the bulk of the information required by NSTA.

article thumbnail

Mastering NSTA Infrastructure Reporting: ArcGIS Pro Best Practice

Exprodat

As part of this, the Energy Act 2016 requires each UKCS operator to appoint a named Information and Samples Coordinator (ISC), who is responsible for reporting petroleum-related information to NSTA. That contains an Infrastructure feature dataset with feature classes suitable for storing the bulk of the information required by NSTA.