Remove Completion Remove Field Remove Refinery
article thumbnail

IBBC Conference: Iraq Prioritises Gas Investment to Boost Growth

Iraq Business News: Oil & Gas

He cited the reactivation of fifth licensing round contracts, the development of Akkas (400 mmscfd) and Mansouriya (300 mmscfd) gas fields, and the award of 14 new gas exploration blocks. Iraq has also completed key gas processing projects, including Basra Gas BNGL (200 mmscfd) and Halfaya (300 mmscfd), with further expansions planned.

Gas 52
article thumbnail

Upstream Midstream Downstream – What is the Difference?

Aresco

Key Processes: Exploration, reservoir analysis, drilling, well completion, and production. Assets: Upstream assets include oil and gas fields (land and mineral rights), drilling rigs, production platforms, and wells. It involves locating, surveying, drilling, and extracting crude oil and natural gas from underground reservoirs.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Oil Review Middle East - Untitled Article

Oil Review Middle East

The Marjan and Berri increments are expected to be onstream in 2025, with the Zuluf field increment scheduled to follow in 2026 and the second phase of Dammam in 2027. Phase One of its Jafurah unconventional gas field development remains on schedule for 2025, with contracts awarded for Phase Two.

article thumbnail

Oil & Gas in 2025: Which Basin Will Dominate U.S. Energy and What’s Behind the $105 Billion in Oil Deals?

Rextag

In 2024, Ecopetrol invested $880 million into drilling new wells, with 91 wells planned for completion in 2025. While the region's mature fields are declining, new projects are helping stabilize production and extend the Gulfs viability as a key energy source. Malo fields , increasing ultra-deepwater oil recovery in the Gulf.

Basin 40
article thumbnail

Sierra Club Asks Court to Ban Use of Legacy DOT-111 Tank Cars

The Energy Law

As if crude producers and midstream transportation companies don’t already have enough problems trying to get crude oil from production fields to refineries thanks to inadequate pipeline infrastructure, tank car supply, rail safety concerns, and new regulations, they now also have to address a new, potentially market-busting lawsuit.

article thumbnail

Louisiana Legislature Modifies Oilfield Cleanup Legislation

The Energy Law

In addition, an EMO can prod the parties to complete site testing in a timely fashion so that contamination issues are defined earlier in litigation. Absent good cause shown, it must be made no later than ninety (90) days after the completion of environmental testing set forth in the EMO. Mr. McNeal received his LL.M.

Casing 40
article thumbnail

President Biden Faces Constitutional Challenges to Revocation of Keystone XL Permit

The Energy Law

Background The Keystone Pipeline is a system of petroleum pipelines designed to transport crude oil from fields in Alberta, Canada and ultimately terminating at refineries on the U.S Canada border was substantially completed before the end of 2020. Constitution. Gulf Coast. energy security, and oil prices. [7]