Remove Casing Remove Completion Remove Upstream
article thumbnail

EPA’s New Audit Program for New Owners of Upstream Oil and Natural Gas Facilities

The Energy Law

Environmental Protection Agency (EPA) announced it had finalized a voluntary disclosure program for new owners of upstream oil and natural gas exploration and production facilities. In most cases, new owners will have nine months from the date of acquisition to notify EPA of their interest in participating in the program. 44991 (Aug.

article thumbnail

Generic vs Domain-Specific AI in Oil & Gas: What Really Works?

Novi

A generic AI solution might spot a decline trend and project it forward, but it completely misses the fundamental reservoir mechanics driving that decline. We’re talking about proppant intensity, cluster spacing, landing zonesthings generic AI doesnt understand and, in most cases, cant even access.

Oil 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The differences between vertical moving beds and rotary drums

Scambio Termico

In the case of an indirect heat exchanger, energy in the heating media whether it be steam, water or air that is not transferred to the solid being heated is retained in the heating media circulation loop. Because material is discharged at the bottom of the exchanger, its a straightforward process to completely empty the equipment.

article thumbnail

URTeC 2024 Recap: Insights and Highlights from the Novi Team

Novi

Where this is not the case, and operators have some drainage in the Jo Mill its more logical to land a well in the top half of the Lower Spraberry and avoid the depleted reservoir below it. Such an interesting approach; we are always interested in where the next big breakthrough in completions/EOR tech might come from.

Basin 52
article thumbnail

Emissions — genuine evidence of arrogance or a smart measure of sustainability?

Yokogawa

Scope 3 : Emissions in complete upstream and downstream supply chain. This means the number of emissions in the complete lifecycle of the product or service. Scope 2 : Emissions resulting from external production of energy, which is then imported to the site.

article thumbnail

Scout Energy Management Acquires Permian Basin Assets from ConocoPhillips

Oil Gas Leads

In this case, the permits in question fall under Permit by Rule (PBR) , a streamlined authorization process designed for facilities that meet specific emissions and operational criteria. The company is looking to divest non-core assets as it prepares to complete its $22.5 billion acquisition of Marathon Oil by the end of the year.

Basin 52
article thumbnail

Boost home heating efficiency: Connecting millions of smart radiator thermostats via AWS IoT Core for LoRaWAN

AWS: Energy (Oil & Gas)

The complete solution also includes LoRaWAN Gateways, backend software components including a digital twin solution, as well as mobile apps for both residents and professional users (used during the installation process of the Gateways and SRTs). It is comprised of intuitive handling, a robust design, and up to six years of battery runtime.

API 52