Remove Blog Remove Petroleum Remove Pipeline
article thumbnail

Mastering NSTA Infrastructure Reporting: ArcGIS Pro Best Practice

Exprodat

As part of this, the Energy Act 2016 requires each UKCS operator to appoint a named Information and Samples Coordinator (ISC), who is responsible for reporting petroleum-related information to NSTA. Section 34 of this act requires pipeline and infrastructure data to be reported. Pipeline points – spools, valves, etc.

article thumbnail

Mastering NSTA Infrastructure Reporting: ArcGIS Pro Best Practice

Exprodat

As part of this, the Energy Act 2016 requires each UKCS operator to appoint a named Information and Samples Coordinator (ISC), who is responsible for reporting petroleum-related information to NSTA. Section 34 of this act requires pipeline and infrastructure data to be reported. Pipeline points – spools, valves, etc.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Louisiana First Circuit Reaffirms Prescription and Subsequent Purchaser Principles

The Energy Law

Chevron Pipelines Company , et al., One of the assessments further included two 1991 LDNR compliance orders to Stone Petroleum, requiring the closure of two pits and finding that the pits were not in compliance with Statewide Order 29-B because they were full and had overflowed in the past. In Lexington Land Development, L.L.C.

Casing 59
article thumbnail

Louisiana First Circuit Reaffirms Prescription and Subsequent Purchaser Principles

The Energy Law

Chevron Pipelines Company , et al., One of the assessments further included two 1991 LDNR compliance orders to Stone Petroleum, requiring the closure of two pits and finding that the pits were not in compliance with Statewide Order 29-B because they were full and had overflowed in the past. In Lexington Land Development, L.L.C.

Casing 52
article thumbnail

Louisiana First Circuit Reaffirms Prescription and Subsequent Purchaser Principles

The Energy Law

Chevron Pipelines Company , et al., One of the assessments further included two 1991 LDNR compliance orders to Stone Petroleum, requiring the closure of two pits and finding that the pits were not in compliance with Statewide Order 29-B because they were full and had overflowed in the past. In Lexington Land Development, L.L.C.

Casing 52
article thumbnail

Valor | Energy Connection – Feb. 24, 2025

Valor

It is part of a broader buildout, including two new pipelines and a 319-acre tank farm. Total petroleum inventories increased by 0.2 The information provided by Valor in this blog is for general informational purposes only, not to provide specific recommendations or legal or tax-related advice. energy exports. million bpd and 4.7

Barrel 52
article thumbnail

EPA Publishes Proposed Renewables Enhancement and Growth Support Rule

The Energy Law

To that end, the EPA has approved the use of short-rotation poplar and willow trees for feedstock in biofuels, the use of cellulosic diesel made from the co-production of cellulosic feedstock and petroleum, and the use of renewable diesel and biodiesel produced from separated food waste.