Remove BCF Remove Finance Remove Pipeline
article thumbnail

A Look Back on 2024

Energy Transfer

It was another exciting and successful year for Energy Transfer and Sunoco, with everything from impactful acquisitions and a major pipeline deal to sports sponsorships and record-breaking donations. Bcf/d, and two additional processing plants that are under construction. 2024 is almost in the books! In a deal valued at $7.3

article thumbnail

Oil & Gas in 2025: Which Basin Will Dominate U.S. Energy and What’s Behind the $105 Billion in Oil Deals?

Rextag

However, in late 2024, the Matterhorn Express pipeline came online, adding 2.5 Bcf/d of takeaway capacity. This pipeline has significantly reduced flaring, stabilized natural gas prices at the Waha hub, and enabled higher oil production by ensuring gas associated with oil drilling can be transported efficiently. MMBbl/d , a 0.3

Basin 40