Remove Barrel Remove BBL Remove Downstream
article thumbnail

Kuwaiti Producers Partner With OilPro & KamberFab to Build API Tanks

OilPro

So w hat to do when your client says “but I really want a Canadian-style, non-field erected, engineered, shop-built 2,500 Bbl tank”? Engineers need to calculate nozzle loads, wind loads, venting and keep up and downstream components in mind. API 650 Guideline 2,500 Bbl tanks and then truck them to site.

API 52