Remove Abandonment Remove Underground Injection Control Remove Utilities
article thumbnail

Commissioner of Conservation Issues Letter Addressing Emergency Measures to Help Louisiana Oil and Gas Industry

The Energy Law Blog

Specifically, the letter addressed the following circumstances: Plugging Requirements : Regulations require any well that has been identified by the operator as inactive with no future utility to be placed on a schedule of abandonment or plugged within 90 days.

Oil 40
article thumbnail

Advancement of CCS in Louisiana

The Energy Law Blog

The next step for GCS will be to obtain a Class VI Underground Injection Control (“UIC”) permit from the U.S. Second, Louisiana already has a developed pipeline infrastructure that is necessary to transport carbon dioxide to where it can be utilized and stored.

article thumbnail

Advancement of CCS in Louisiana

The Energy Law Blog

The next step for GCS will be to obtain a Class VI Underground Injection Control (“UIC”) permit from the U.S. Second, Louisiana already has a developed pipeline infrastructure that is necessary to transport carbon dioxide to where it can be utilized and stored.