article thumbnail

Danish Companies Partner on Sustainable Fuel Project

NGT News

Moller – Maersk, DSV Panalpina, DFDS, SAS and Ørsted have entered a partnership with the goal of developing a hydrogen and e-fuel production facility by as soon as 2023. When fully scaled-up by 2030, the project could deliver more than 250,000 tons of sustainable fuel to buses, trucks, maritime vessels and airplanes […].

article thumbnail

E-Fuels: A technoeconomic assessment of European domestic production and imports towards 2050

Energy Central

Concawe and Aramco have jointly commissioned this study, aiming to conduct a techno-environmental (Part 1) and economic (Part 2) analysis of different e-fuels pathways produced in different regions of the world (North, Centre and South of Europe, as well as Middle East and North Africa) in 2020, 2030 and 2050, with assessments of sensitivities to multiple (..)

E&A 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

E Kerosene | The challenges of scaling up e-kerosene production in Europe

Energy Central

E Kerosene While ReFuelEU seems to have triggered a lot of ambitious announcements, many challenges still stand in the way of the scaling up of e-kerosene production in Europe : ● Some regulatory loopholes, including a lack of incentives to supply e-kerosene before 2030, looming regulatory incentives to use e-fuels in the road sector, and the possible (..)

E&A 52
article thumbnail

Airbus opts for e-methanol and rotor sails for new transatlantic trio

Energy Central

Airbus opts for e-methanol and rotor sails for new transatlantic trio The new fleet is expected to reduce average annual transatlantic CO2 emissions from 68,000 to 33,000 tonnes by 2030. °C pathway of.

E&A 52
article thumbnail

Maersk agrees on project with Spain to make e-methanol for its fleet

Energy Central

Maersk plans to produce up to two million tonnes of e-methanol a year in Spain by 2030 to supply its fleet of cargo ships and reduce its carbon footprint, the shipping giant and the Spanish government said.

IT 40
article thumbnail

BEI otorga 400 MDE para ampliar 30% la capacidad de enriquecimiento de uranio en planta francesa

Oil & Gas Magazine

Acerca del proyecto Las operaciones productivas iniciales estn previstas para 2028 y la puesta en servicio completa para 2030. Adems que contribuye a reforzar la soberana energtica y la autonoma estratgica de Europa, as como a mejorar la seguridad del suministro. La primera piedra del proyecto de ampliacin se coloc el 10 de octubre de 2024.

E&A 107
article thumbnail

The Future of Carbon Capture and Sequestration

The Energy Law

By ratifying the 2015 Paris Agreement, [1] nations across the world made a commitment to reducing greenhouse gas emissions by at least 40% by the year 2030. 1] [link] [2] Nigel Bankes, Jenette Poschwatta & E. 1] [link] [2] Nigel Bankes, Jenette Poschwatta & E. 585, 589 (2007). [3]

E&A 52