Remove 2028 Remove Completion Remove Transportation
article thumbnail

ONEOK’s Expanding Footprint in the Permian Basin

Oil Gas Leads

ONEOK expects higher ethane recovery rates , further increasing the volumes transported. The pipeline expansion will be completed in 2025 , ensuring ample capacity for long-term growth. Crude Gathering & Pipeline Expansion ONEOK has integrated crude gathering and transportation assets from the Medallion and EnLink acquisitions.

Basin 52
article thumbnail

Louisiana International Terminal Project Receives Federal Funding Boost

The Energy Law

Bernard Transportation Corridor that will connect lower St. The environmental studies are expected to be completed sometime in 2025, and the terminal’s estimated opening will be in 2028. Bernard and the terminal to the interstate system.

article thumbnail

Oil & Gas in 2025: Which Basin Will Dominate U.S. Energy and What’s Behind the $105 Billion in Oil Deals?

Rextag

In 2024, Ecopetrol invested $880 million into drilling new wells, with 91 wells planned for completion in 2025. This pipeline has significantly reduced flaring, stabilized natural gas prices at the Waha hub, and enabled higher oil production by ensuring gas associated with oil drilling can be transported efficiently. MMBbl/d , a 0.3

Basin 40