Remove 2025 Remove Maintenance Remove Midstream
article thumbnail

Permian Basin Gas Production Pushes Limits – Infrastructure Expansion Needed

Rextag

The recent launch of the Matterhorn Express Pipeline, developed by a joint venture led by WhiteWater Midstream, offers some relief. Bcf/d of capacity, and East Daley predicts it will be full by mid-2025. Beginning operations in early October, the pipeline can transport up to 2.5 Bcf/d of natural gas from the Permian to Katy, Texas.

Basin 40
article thumbnail

Whitecap Resources 2025 Outlook: Efficiency Gains Drive Sustainable Growth

Oil Gas Leads

As we enter 2025, Whitecap Resources Inc. 2025 Production & Financial Guidance Whitecaps 2025 guidance includes: Production: 176,000 180,000 boe/d (63% liquids) Capital Investment: $1.1 $1.2 Kaybob 15-07 Gas Processing Facility: Expected to reach full capacity in H2 2025 , improving cost efficiencies. billion ($2.81/share)