article thumbnail

Louisiana Second Circuit Provides Guidance as to Good Faith Required When Conducting Operations Necessary to Interrupt Prescription of Mineral Servitude

The Energy Law

The well was a dry hole, however, and was therefore plugged and abandoned on April 21, 2006. 3/4/20), 2020 WL 1036500. [2] A well was spud on March 28, 2006. 1] 53,252 (La. 2] 45,160 (La. 5/28/10), 37 So.