Remove 2017 Remove Field Remove Refinery
article thumbnail

Nigeria Oil Industry Overview

Drillers

The country’s first field began producing in 1958 at a rate of 5,100 BPD. company has a 40-60 joint venture with the NNPC, which is the majority shareholder, and stakes in several offshore fields, including several deepwater blocks that have yet to be developed. The government has been fighting the illicit refineries for years.

Oil 52
article thumbnail

President Biden Faces Constitutional Challenges to Revocation of Keystone XL Permit

The Energy Law Blog

Background The Keystone Pipeline is a system of petroleum pipelines designed to transport crude oil from fields in Alberta, Canada and ultimately terminating at refineries on the U.S 8] This time, the permit was approved within two months, on March 23, 2017. [9] Constitution. Gulf Coast. energy security, and oil prices. [7]

article thumbnail

President Biden Faces Constitutional Challenges to Revocation of Keystone XL Permit

The Energy Law Blog

The Keystone Pipeline is a system of petroleum pipelines designed to transport crude oil from fields in Alberta, Canada and ultimately terminating at refineries on the U.S When President Trump took office in January 2017, he promptly issued a Presidential Memorandum formally inviting TC to again re-submit its application. [8]