Remove 2015 Remove Maintenance Remove Pipeline
article thumbnail

All or Nothing: Regulators Strictly Define Pipeline Abandonment

The Energy Law

On August 16th, the Pipeline and Hazardous Materials Safety Administration (“PHMSA”) issued an advisory bulletin to clarify the regulatory requirements that may vary depending on the operational status of a pipeline under 49 C.F.R. These pipelines may still contain hazardous materials. Parts 192 and 195 (2016).

article thumbnail

U.S. Fifth Circuit Limits Vessels’ Obligations Under Louisiana One-Call Reporting

The Energy Law

Plains Pipeline, L.P. 14-31046, 2015 U.S. The cutter head punctured a pipeline owned by Plains Pipeline that carried product for Phillips 66. The Fifth Circuit held that Phillips’ exclusive use alone did not grant Phillips a propriety interest in the pipeline within the meaning of Robins. LEXIS 14337 (5th Cir.

article thumbnail

Proposed Railroad Rules May Impact Crude Oil Producers: Proposed DOT/PHMSA Oil Tank Car Rules

The Energy Law

But even when 55,000 of the newer CPC-1232 cars are in service by 2015, there will still be 45,000 older ones being used to meet demand. However, two of the three options proposed by PHMSA for a new agency standard, to be known as DOT-117, require a greater shell thickness than CPC-1232 requires.