Remove 2011 Remove Oil Remove Petroleum
article thumbnail

How the Oil & Gas Industry is Helping Reduce Emissions

Energy Transfer

’s progress in reducing emissions over the past decade has come from investments made by the oil & gas industry? According to just-released data from the Environmental Protection Agency, methane emissions across all major oil and gas basins in the U.S. have fallen 44 percent since 2011. In fact, the No.

Oil 52
article thumbnail

EPA Releases Final Rule Requiring Oil and Gas Sources to Report Emissions of Greenhouse Gases

The Energy Law

Environmental Protection Agency (EPA) released its final Subpart W rule to cover petroleum and natural gas facilities under the agency’s Greenhouse Gas (GHG) Reporting Program. The original Subpart W rule for petroleum and natural gas facilities was proposed in March 2010.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Proposed EPA Rules Would Subject Oil and Gas Sources to Mandatory Reporting of Greenhouse Gas Emissions

The Energy Law

On March 22, 2010, EPA announced proposed rules to amend the Mandatory Reporting of Greenhouse Gases Rule to cover additional sources including petroleum and natural gas facilities emitting 25,000 metric tons or more of greenhouse gas emissions. and April 20, 2010 in Washington, D.C.

Gas 40
article thumbnail

President Biden Faces Constitutional Challenges to Revocation of Keystone XL Permit

The Energy Law

The Keystone Pipeline is a system of petroleum pipelines designed to transport crude oil from fields in Alberta, Canada and ultimately terminating at refineries on the U.S As of 2011, after three years of review, the State Department had not approved TC’s application for a cross-border permit. energy security, and oil prices. [7].

article thumbnail

President Biden Faces Constitutional Challenges to Revocation of Keystone XL Permit

The Energy Law

Background The Keystone Pipeline is a system of petroleum pipelines designed to transport crude oil from fields in Alberta, Canada and ultimately terminating at refineries on the U.S As of 2011, after three years of review, the State Department had not approved TC’s application for a cross-border permit. Constitution.