Remove 2010 Remove Downstream Remove Operator
article thumbnail

Texas Supreme Court Holds Producer Not Required to Share in Natural Gas Pipeline Compression Costs

The Energy Law

Kachina”) operates a natural gas gathering system, as well as a gas pipeline. The Agreement had an initial five (5) year term, and was scheduled to expire in May 2010. Whether this decision narrowly reflects the language of one specific contract or represents a sea change is yet to be determined. emphasis by Court).

article thumbnail

EPA and BSEE Team Up to Resolve Offshore Environmental Violations

The Energy Law

ATP operated a float cell on the platform as an essential part of its wastewater treatment system to separate and remove oil and suspended solids from its produced water prior to its discharge into the Gulf. ATP is the ATP Innovator’s operator and ATP-IP is the platform’s owner. 110.4 & NPDES General Permit, Part I, Section C.3

article thumbnail

Fifth Circuit Rejects EPA’s Overreaching on CAA and MBTA

The Energy Law

Citgo’s Corpus Christi refinery operates a wastewater treatment system that sends all oily wastewater to several Corrugated Plate Interceptor (“CPI”) separators. The CPI separators have roofs that prevent the release of air emissions, but the equalization tanks (as well as the other downstream equipment) do not. 1] U.S.