Remove 2008 Remove Maintenance Remove Operator
article thumbnail

EIA Lastest News – Product Prices & Pipeline News

The Energy Law

Furthermore, on September 5, FGT announced maintenance work beginning on September 6, which is expected to last until September 8. The unscheduled maintenance is on the larger of the two units located in Mississippi at Tennessee Carnes Interconnect, upstream of FGT Compressor Station. From the EIA

article thumbnail

LDEQ May Require Louisiana Facilities Exempt From Air Permitting to Maintain Emission Records

The Energy Law

Act 547 additionally defines “potential emissions” as “the emissions the facility is capable of emitting considering all control measures in place, utilized and properly maintained and historical practices, including hours of operation and number of employees at the facility.”

article thumbnail

EPA’s Shifting Guidance on Startup, Shutdown, and Malfunction Defenses in State Implementation Plans and Its Effect in Louisiana

The Energy Law

In 2016, with EPA approval, Louisiana finalized its SIP revisions eliminating provisions that allowed for automatic and discretionary exemptions from emission limitations during startup, shutdown, maintenance, and malfunctions. 2008), and a 2014 decision, in which the D.C. LAC 33:III.507.J.1. 2020 SSM SIP Policy Memorandum.